CallAdapt CRM · Practical guide

Solar installation sales workflow

Qualify installation requests before estimating generation

Reviewed 24 November 2026

Practical workflow

Start with site type, approximate electricity consumption, available roof area and the installation objective. Schedule a technical assessment; avoid promising fixed savings before evaluating shading, panel orientation and site conditions.

Fictional example

Fictional example: a factory wants to reduce daytime consumption. An engineer finds part of the roof unsuitable. The salesperson records a revised estimate and sends a smaller alternative with its assumptions instead of committing to the original advertising figure.

Measurement and handover

Retain the assessment reference, quotation version, review date and expected decision. Distinguish signed contracts from completed installations and hand approved specifications to delivery. Measure how many surveys produce feasible quotations.

Reusable record template

Technical qualification template: facility type | daytime consumption | roof area | survey reference | shading constraints | proposed capacity | calculation assumptions | engineer approval | quote review date. When a buyer asks for two alternatives, keep both under one opportunity, documenting differences in cost, capacity and expectations without turning estimates into performance guarantees.

Evaluate before buying

This is workflow guidance with fictional examples, not a promise of untested features or integrations. Request a demo for your required workflow.