Practical workflow
Start with site type, approximate electricity consumption, available roof area and the installation objective. Schedule a technical assessment; avoid promising fixed savings before evaluating shading, panel orientation and site conditions.
Fictional example
Fictional example: a factory wants to reduce daytime consumption. An engineer finds part of the roof unsuitable. The salesperson records a revised estimate and sends a smaller alternative with its assumptions instead of committing to the original advertising figure.
Measurement and handover
Retain the assessment reference, quotation version, review date and expected decision. Distinguish signed contracts from completed installations and hand approved specifications to delivery. Measure how many surveys produce feasible quotations.
Reusable record template
Technical qualification template: facility type | daytime consumption | roof area | survey reference | shading constraints | proposed capacity | calculation assumptions | engineer approval | quote review date. When a buyer asks for two alternatives, keep both under one opportunity, documenting differences in cost, capacity and expectations without turning estimates into performance guarantees.